Wednesday, August 17, 2011

Day 15




Accomplishments:

1. Finished cutting out the door.
2. Finished making "stringers" for the rafters.
3. Made the remaining three diagonal boards to stabilize the walls.
4. Cleaned up the yard for the first time since June.

Temperature: 10


"Focus on the journey, not the destination. Joy is found not in finishing an activity but in doing it."
      -Greg Anderson

Total Hours: 5

Day 14



Accomplishments:
1. Cut two of the 4 boards needed to make an A in the roof.
2. Cut one of eight boards that will go diagonally inside the walls to make them more stable.




Total Hours: 2

Day 13

Accomplishments:
1. Cut four more boards
2. Screwed those four boards in
3. Put more screws in the other four boards
4. Took down the board that were initially needed to stabilize the beam across the top.



Total Hours: 4

Day 12



Accomplishments:
1.We screwed in the other 3 boards.

Problems:
1. It was really hot, so we put the tramp mat up to block the sun.



Total Hours: 3

Day 11




Accomplishments:

1. Cut boards to go between beams.
2. Screwed in one of four boards.



Problems:

1. The speed on the drill was stuck between one and two. Me and Brittni were unaware and had to be enlighten by my dad's intelligence.






"Not creating delusions is enlightenment."
        -Bodhidharma

Total Hours: 3

Day 10


If we were going by days that either me or Brittni worked on the playhouse, there would be a day where me and my dad put up the first three boards for the roof and marked 8 more boards. But, seeing as how this is both mine and Brittni's project Day 10 will be the day me and Brittni, with the help of my dad, placed the next 4 boards.

After a long break, we finally looked like we were making progress.

Total Hours: 4

Day 9









Accomplishments:
1. Finished window frames
2. Moved playhouse onto trailer with the help of Katie, Bishop, Dad, Mom, Roxy, Travis, Crystal, Britany, Brittni and Myself.
3. Put up siding
4. Painted the first coat






Special Thanks to:
Britany
Crystal
Dad
Dani
Maddie
Michelle
Mom
Nathan









"There is no such thing as a self-made man. You will reach your goals only with the help of others."
           -George Shinn



Total Hours: 3

Day 8



Accomplishments:
  1. Drained tarp on roof
  2. Moved, took staples out of, cleaned, and moved siding.
  3. Cut boards for the door
  4. Made frames for the windows
  5. Got bitten by misquitos



Total Hours: 8

Day 7


Accomplishments:
1. Leveled Walls

Problems: 
1. Leveler didn't work
2. Our leveled walls were sometimes not very level, and had to be redone.


Explanation:
The lever didn't work on the walls because the ground wasn't level, which made the floor not level, making the walls not level.

Solution:
We figured if the walls were the same length from the ground to the top of the wall, they would be level. We're not completely sure if this is actually true, but it sure seems like it.


Total Hours: 5

Thursday, August 11, 2011

Day 6


Accomplishments:
1. Put together the last two walls
2. Mounted the remaining walls to the floor.



Problems:
1. The drills ran out of battery
2. A drill bit was needed to get 4'' screws in.




Total Hours: 5